Sign in   |  Join   |  Help
Untitled Page

ARCHIVED FORUM -- March 2012 to February 2022
READ ONLY FORUM

This is the second Archived Forum which was active between 1st March 2012 and 23rd February 2022

 

Programming MLGW

rated by 0 users
This post has 1 Reply | 2 Followers

JensT
Not Ranked
Posts 36
OFFLINE
Bronze Member
JensT Posted: Wed, Dec 23 2020 12:48 PM

I need some help with programming MLGW with the BS3.

All I need to make it do is switch on/off my LG screen when powering up and down my BS3.
Ive been watching a lecture video given by John Pechiar and now know how to connect to the box and semi know how it should be set up. 
The easiest way I think would be to connect the MLGW with the screen through ethernet - does anyone know the IP port LG uses? After searching around for a while I’ve gotten many different answers..
Does anyone know what command string to use? From what I can tell, also after searching the web, the command should simply be «k a» - although I find it strange that on and off have the same command?
Any help would be much appreciated. Would very much like to get rid of that LG remote.
Giovanni
Not Ranked
San Francisco Bay Area
Posts 56
OFFLINE
Bronze Member

Just in case you consider a home automation integration, I built an integration with Home Assistant, the leading open-sourche home automation, here:

https://github.com/giachello/mlgw

 

It has an added function that it can read the actual Masterlink Traffic so it has much more functionality than just light/control commands, in fact it can basically respond to any key command in the system on any device.

Page 1 of 1 (2 items) | RSS