ARCHIVED FORUM -- March 2012 to February 2022READ ONLY FORUM
This is the second Archived Forum which was active between 1st March 2012 and 23rd February 2022
I wanted to say that this option will be even more expensive than the new one, but I did prefer to wait for your confirmation.It is likely that your service prices are more expensive than with us. I think builders and other contractors.
But it's an interesting way of build.
It's smart to do a installation yourself.So, at least you'll have everything under control.
marexy:It's smart to do a installation yourself. So, at least you'll have everything under control.
Regards
Kiran
Born in NL; I ride ML
Kiran:UPDATE I changed the build again... I’m adding dedicated audio in wall keypads... I want audio control in every room and an iPhone and Alexa is not enough...
I changed the build again...
I’m adding dedicated audio in wall keypads...
I want audio control in every room and an iPhone and Alexa is not enough...
That is a wise decision!
MM
There is a tv - and there is a BV
Always thought the Busch priOn was a nice panel...
benjnz:Always thought the Busch priOn was a nice panel...
What are the long steele tubes going through the floor for ?
BeoSound 9000 MK3, BeoLab 8000, BeoLab 6000, BeoLab 3500, LCS9000, BeoLab 11, BeoLab 7.2, BeoLab 7.1, Beolab 4 PC, BeoCenter 2300, BeoSound Century, BeoSound 8, Beosound 2, BeoVision 7-40 MK2 , BeoVision 7-32 MK3, BeoVision 6-22, BeoVision 4-42, BeoMedia 1, BeoCom 4, BeoLink 1000, BeoLink 5, BeoLink 4 & BeoTime
BeoIce:What are the long steele tubes going through the floor for ?
Have you settled on AV distribution as yet Kiran?
I'm looking to replace a UHD Atlona solution for something HDR happy, looking at the Opus and Omni, curious as to your direction...
boskonay:Have you settled on AV distribution as yet Kiran?
check these :)
https://adage.com/creativity/work/rema1000-rema1000-smarthouse/55320
My wiring issue is that the HDMI standard is changing from 18GHz to 48GHz with the new HDMI standard so I've been reluctant to put in fixed HDMI ports in the wall. I've left it so I can repull when needed at a future date. Cabling is such a pain in the neck and it certainly looks like you have had your share. It looks like a great build and thanks for sharing.
With the constant change in tech it's highly desirable to do the approach we used in server/data room construction and such, don't just install wires, put large enough conduit in the walls and pull the cables, and leave a pull cord in for pulling additional cables in the future. Sadly, the house I have is 50 plus years old and constructed in an odd way that makes running cables in the wall at all close to impossible. If I were building new though I'd incorporate a lot of lessons learned from building such data rooms and such.
Jeff
I'm afraid I'm recovering from the BeoVirus.
Wow!
Hope you've got some architects drawings for this.
Beo Century ,Beoplay V1, Beocenter 6, Ex-Beolit 12, Beotime , A8. Beolit 15 , Form 2i , Beolab 2000, Beoplay A3.Beosound 1
Making good progress Kiran
Where do you expect to be for Christmas and how long will your guys be taking a break for before resuming? I am hoping to be done on my own property in 4-6 weeks time so hopefully just in time to celebrate Christmas in my newly renovated home. Just got the upstairs bathroom to complete, the staircase, which is currently being constructed, painters and decorators in followed by several weeks of snagging I should think! Cheers, Simon...
B&O products are V1-32, BS2, H95, E8 and an Essence remote.11-46 now replaced with Sony A90J 65”, Sony HT-A9, Sony UBP-X800M2 and Sony SRS-NS7.
Keep them coming Kiran. Fascinating stuff. I think you are all slightly mad and brave for living in whilst all this is going on. We extended our house while living in it - absolutely nothing to this scale and my wife made me promise never do that again.
If you think nobody cares, try missing a couple of payments.
Same for me Stonk. My renovation has been a year long and I will definitely never go through this again. I have been living here through it all apart from 6 weeks when I moved out for major structural work. My stress levels have never been so high for all sorts of reasons. To think of Kiran and his family are going through, goodness me!